Oracle Primavera p6 guide:

Advertisement

Chapter 1 discusses the elements of project planning, including the creation and use of work breakdown structures. This chapter additionally discusses Caltrans’s standard schedule requirements, so an understanding of what the contract requires can be gained. 

Chapter 2 discusses the different types of scheduling methods, and then teaches the basic terminology associated with CPM scheduling.

Chapter 3 provides detailed instruction on the development of critical path networks.


TABLES OF CONTENTS:
Advertisement
  1. Project Planning
  2. Scheduling Fundamentals
  3. Critical Path Method
  4. Primavera P6 Basics
  5. Developing and Formatting Schedules
  6. Creating Schedule Updates
  7. Reviewing Baseline Schedules
  8. Reviewing Update Schedules
  9. Time Impact Analysis (TIA)