Overhauling of steam turbine

  Advertisement

INTRODUCTION OF BOOK :

Advertisement

To provide general guidelines for planning and performing a steam turbine maintenance outage.

This first volume of Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections presents general practices for each of the fundamental maintenance activities usually associated with an outage: 

• Operational turbine-generator condition assessment 

• Pre-outage planning and bidding 

• Unit shutdown procedures 

• Foreign material exclusion 

• Disassembly and recording clearances


TABLES OF CONTENTS:

Advertisement

  1. TURBINE-GENERATOR CONDITION ASSESSMENT – IN SERVICE
  2. PRE-OUTAGE PLANNING AND BIDDING
  3. UNIT SHUTDOWN
  4. DISASSEMBLY AND RECORDING CLEARANCES
  5. TURBINE-GENERATOR CONDITION ASSESSMENT
  6. OIL FLUSHING
  7. ROTOR ALIGNMENT AND BALANCING
  8. PRE–STARTUP CHECKS
  9. POST-OUTAGE ACTIVITIES