To provide general guidelines for planning and performing a steam turbine maintenance outage.
This first volume of Guidelines for Reducing the Time and Cost of Turbine-Generator Maintenance Overhauls and Inspections presents general practices for each of the fundamental maintenance activities usually associated with an outage:
• Operational turbine-generator condition assessment
• Pre-outage planning and bidding
• Unit shutdown procedures
• Foreign material exclusion
• Disassembly and recording clearances
TABLES OF CONTENTS:
Advertisement
- TURBINE-GENERATOR CONDITION ASSESSMENT – IN SERVICE
- PRE-OUTAGE PLANNING AND BIDDING
- UNIT SHUTDOWN
- DISASSEMBLY AND RECORDING CLEARANCES
- TURBINE-GENERATOR CONDITION ASSESSMENT
- OIL FLUSHING
- ROTOR ALIGNMENT AND BALANCING
- PRE–STARTUP CHECKS
- POST-OUTAGE ACTIVITIES