Preparation of inspection:

Advertisement

  • Evaluate latest operating records and related data
  • Check for availability of spare parts
  • Perform functional inspection of modular units
  • Check shaft line grounding
  • Shutdown the system
  • Remove turbine enclosure, insulation and vibration pickups
  • Protect ends of cables against damage

TABLES OF CONTENTS:
Advertisement
  1. Work related documents
  2. Preparation for inspection
  3. Alignment checks
  4. Disassembly
  5. Non destructive testing
  6. Fact finding
  7. Re assembly
  8. Commissioning