Turbine and auxiliaries

Advertisement

  • Acid cleaning-oil lines

  • Lube oil flushing and hydraulic test

  • Jacking oil lines flushing and hydraulic test

  • Detergent flushing and hydraulic test of regenerative system

  • BFP commissioning

  • Commissioning of HP/LP heaters 
  • Barring gear operation
  • Vacuum tightness test
  • Steam blowing procedure
  • Check list for first rolling of turbine

ACID CLEANING in turbine

Advertisement
• Purpose?
• Steps
– Mechanical cleaning and flange preparation
– Acid cleaning
– Passivation and drying
– Final erection in position